|
PROFESSIONAL ABRIDGEMENT
- Currently working with M/s Bechtel India
Pvt Ltd. as an Engineer.
- Skillful in Preparation of
specification, datasheets, review of technical offers and preparing
purchase specifications for mechanical equipment (including slurry
pumps, liquor pumps, reciprocating/ centrifugal compressor, belt
conveyor, heat exchanger(plate as well as shell tube), crusher,
vibrating screen, dust collection system, Water treatment plant, cooling
tower, agitators, gear box, cooling tower, calciner, EOT Cranes).
- Pre bid and detail engineering
- Preparation of Purchase Requisition,
Vendor Data & Drawing review, 3D Model review Attending project HAZOP’s
and IPF’s meetings.
- Familiar with International code
- Technical discussions with vendor and
Client
BECHTEL WORK
HISTORY: Joined BECHTEL in October 2005 as Mechanical Engineer
1) Currently working
in Takreer Oil Refinery Project as Engineer (December, 2008 – Till date)
- Responsible for Package sea water
intake bar and band screen, Loading Arms, D.M. Water treatment.
2) Worked in FEED
stage on Worsley Growth & Efficiency Project ( June, 2007 - November
2008)
- Responsible for Vacuum Pumps, Rotary
Blowers, Dust collector system, Air cannon, Plate heat exchanger,
cooling tower, and Axial Exhaust Fans.
3) Worked in Sohar Aluminium
Smelter Project ( October, 2005 – May 2007)
- Responsible for Centrifugal pump,
Centrifugal compressor system, weigh bridge, Alumina Trailer, Liquid
Pitch Trailer, Flat bed trailer, Sweeper Vacuum Cleaner, Loaders, Fork
lifts Road tractor (Prime mover)
PREVIOUS WORK
HISTORY: 1) Worked as Deputy Manager in Alumina Refinery
of Aditya Birla Group Hindalco Industries Limited at Renukoot (August
2000- September 2005):
Responsible for
Equipment and spare planning of the Alumina Refinery plant for
maximizing equipment availability and optimum efficiency for equipments
as calciner, belt conveyor, heat exchanger(plate as well as tube shell
arrangement ), rake drive, hydraulic power pack, disc filters,
agitators, cooling towers, vacuum pumps, fan, blowers, centrifugal
pumps, ball mill, crushers, vibrating screen, dust collection system,
reciprocating compressors, centrifugal compressors, diesel compressors,
air locks, screw conveyors, water treatment plant, screw air dryers, air
dryers, ammonia refrigeration system, burners, centrifuge machines,
fluid couplings, diaphragm operated pumps(GEHO make), safety valves,
caustic unloading system, lifts, drum filters, slurry valves etc
Activities
involved:
- Material Requisition for spare
parts/ equipment for Purchase
- Technical discussions with vendor
- Carrying out schedule maintenance
activities
- Condition Monitoring of major
equipments with the help of methods like NDT, Vibrations Analysis
etc Performance monitoring of critical equipments by using methods
like MTTR and MTBF
- Incorporation of engineering
developments on equipments for improvement in efficiency and ease in
operation
2) Worked as
Assistant Superintendent Plant in Alumina Refinery of Aditya Birla Group
Hindalco Industries Limited at Renukoot (August 1997- August 2000):
- Responsible for Centrifugal
Compressor system,
- Replace wider conveyor to avoid
alumina spillage
- Caustic Unloading System.
- EOT Cranes
- Up gradation of Water Treatment
plant
Activities involved:
- Preparation of techno- commercial
comparisons, negotiation on financial and delivery terms and
recommendation for placing order with clearly defined scope.
- Responsible includes Supervision of
drawings for lay outing, co ordination with civil, electrical,
- Instrument etc. dept. Co-ordination
and supervision of the execution of the projects in line with
planned schedule chart timely completion of the projects.
- Shop performance testing of
centrifugal pumps and centrifugal fans.
- Site visit and system integrity
checking of fans, team member in overhauling and erection of
integrally geared centrifugal compressors.
3) Worked as
Senior Engineer in Project Engineering Department of Aditya Birla Group
Hindalco Industries Limited at Renukoot (October 1995- September 1997):
- Hot and Cold Mill( Davy Supply)
Revamping
- Responsible for interfacing with M/s
Mecon Engineering
Activities
involved:
- Supervision includes preparation of
piping drawings for lay outing.
- Coordination with civil, electrical,
instrument etc. dept.
- Coordination and supervision of the
execution of the projects in line with planned schedule chart timely
completion of the projects.
- Responsible for preparing techno-
commercial comparisons, negotiation on financial and delivery terms
and
- Recommendation for placing order
with clearly defined scope
4) Worked as
Engineer in Project Engineering Department of Aditya Birla Group
Hindalco Industries Limited at Renukoot ( June 1991- September 1995):
- Pig casting Plant (Well men Supply).
Slab Casting and Billet Casting.
Responsible for cooling
water system, cooling tower & piping etc.
Activities
involved:
- Preparing piping drawings, bill of
materials and material specification
- Equipment layout
- Coordination with civil, electrical,
instrument and field for execution the job
COMPUTER
SKILLS: MS OFFICE, ORACLE 8i, Familiar with MS power point for
presentation and info works.
Present
Emoluments : 9.5 Lacs + etc.
Expected
Emoluments : 11.5 Lacs + etc.
Notice period
: one month
|